InterContinental London – The O2 – 15th floor replacement ISU

April 10, 20220

Client : Balfour Beatty Regional Construction Limited

Access company: Wulf Lifting

Access equipment: Demag 220-5 78 meters main Jib with a 21 meter Fly Jib

Site: InterContinental London – The O2

Description of works: 15th-floor replacement ISU, glass lifted from the front entrance of the hotel lifted over the top of the Hotel and lowered to the rear façade of the building.